ConcepTest: Stream Diversion Structure #2

ConcepTest questions by David McConnell , David Steer , Walter Borowski, Jeffrey Dick, Annabelle Foos, Jeffrey Knott, Alvin Konigsberg, Michelle Malone, Heidi McGrew, Kathie Owens, and Stephen Van Horn
This material was originally created for Starting Point:Introductory Geology
and is replicated here as part of the SERC Pedagogic Service.

Initial Publication Date: May 8, 2006

Question:

The town of Pleasantville is located at a meander bend in a floodplain. In order to reduce the threat of property loss due to erosion, Pleasantville's engineer proposes the construction of the diversion structure shown in the diagram below.

Stream Diversion Structure Diagram

Following construction of the diversion, the erosive capacity of the stream at point X will ______________.

a. increase
b. decrease
c. stay the same

Student Responses:

No data yet. The correct response is a.

If you would like to help acquire more Before and After statistics for this example, please contact the authors (see link at top of page).

References and Notes:

Close
NAGT Join small

As a frequent visitor please consider joining the National Association of Geoscience Teachers or making a donation to help ensure this site can continue to offer access to high-quality geoscience education materials.

  Join NAGT Today »

  Make a donation »

Already an NAGT member? Login now to avoid these messages in the future.