Quantifying geomorphic change after a dam-break, using Structure from Motion photogrammetry and a river-in-a-box
Summary
In this lab and computer activity, students use an emriver river-in-a-box (RiB) to simulate a dam-break event. With their mobile phones they take a series of photos from the RiB landscape before and after the event. These photo-collections are used in Structure-from-Motion software to produce before and after event digital elevation models (DEMs). From these models a DEM-of-Difference (DoD) is calculated, showing areas of erosion and deposition in the RiB landscape as a result of the dam-break event.
Learning Goals
Content/Concept Goals:
- Learn to use Structure from Motion (SfM) analysis to create 3D landscape models (Javernick et al., 2014, Woodget et al., 2014).
- Calculate DEMs of Difference (DoDs) from multi-temporal topographic data to assess erosion and deposition in a landscape (James et al., 2012).
- Evaluate the geomorphic effect of a dam-break.
Higher order thinking skills goals:
- Apply data analysis (with step-by-step instructions)
- Interpretation of the DoD landscape change results, while reflecting back on the original situation.
Other skills goals
- Students learn to work with SfM and GIS software, produce a miniature reservoir and observe the development of a dam-break.
Context for Use
Type and level of course:
This activity was designed for a research methods module (UK level 5) on an undergraduate course in Physical Geography. The activity took place over two class sessions, one using the River-in-a-Box (RiB) emriver EM2 stream table to simulate a dam-break and collect image data, and one using SfM and GIS software to analyse the results.
Students must have mastered before beginning
The students don't need to have any specific skills, though the activity assumes the tutor has a thorough knowledge of/experience with all techniques used.
The SfM concept was explained in a lecture at the start of the activity. Some experience using GIS is helpful, but the instructions provided are suitable for students without GIS practice.
A basic understanding of the processes of erosion and deposition in landscape development will help with the interpretation of the data.
How situated in a course:
This activity was undertaken during two 4-hour class sessions as part of a two-semester (24 sessions) research methods module for 2nd year (UK level 5) undergraduate Geography students. The activity was not assessed. Its purpose is to demonstrate analysis techniques which students can use in future aspects of their course, such as their dissertation research projects, and which will increase their employability (i.e. RiB river geomorphology simulations, SfM 3D modeling, DoD landscape change assessments).
Description and Teaching Materials
Description and Teaching Materials
- The session starts with a brief (30 min.) lecture on the concept of Structure from Motion and the requirements for image data collection.
- This is followed by a lab activity where students work in groups of up to 5 students. Depending on the number of stream tables available, the groups may need to work in shifts.
- The stream tables should be ready to go with a sufficiently saturated substrate for the students to work with.
- Each group gets 15 minutes to explore the river system.
- Next, they are asked to use a walled culvert to produce a reservoir on the top end of the steam table.
- Downstream from the culvert a meandering channel is created to drain any water overflowing from the reservoir.
- Create a dam-break by increasing the flow into the reservoir. When the water level is sufficiently high and water starts seeping around the dam, manually remove the dam by lifting it straight up from the box surface. Sediment from around the dam will initially collapse, fill the dam void and block the flow, but after a few moments, the reservoir water will burst through the loose material and create significant geomorphic change downstream from the dam.
- Students can test a few dam breaks before continuing with image data collection (see examples in film linked below).
- Students add 10 ground control points (GCPs) across the stream table surface and edges. 4x4 duplo blocs with marker dots and numbers work well in the table. Masking tape with marker dots and numbers can be used on the table edges. Note that the blocks are ideally in stable positions, so their position is not affected by the dam-break event.
- Measure locations with a total station or possibly a tap measure to get their position in a (hypothetical) coordinate system.
- Note GCP locations and numbers on a drawing of the stream table as they may not be sufficiently recognisable from the photos.
- When a suitable reservoir set-up is achieved, students create an image dataset of the 'before' dam-break situation, by walking around the table while taking regular oblique photos with their mobile phones. Around 20 photos should cover the table from all directions. A few extra overview photos taken from higher up can improve the modeling process. Students have to make sure that there are no people surrounding the table and therefore included in the photos, as any moving objects will affect the modeling results.
- Execute the dam-break as above.
- Create another set of photos as done previously from the 'after' situation. It may be useful to include a piece of paper indicating the dam-break stage (before/after) and attempt number, to make it easier to identify photo series at a later stage.
- The next session starts with a lecture, which gives an overview of SfM applications, strongly focussing on geomorphic change in river environments.
- Next, the students use Agisoft Metashap SfM software to produce 3D models of the before and after dam environment and to derive DEMs of the dam-break landscape from these. A handout is provided that guides students through the analysis step-by-step (see example handout included below).
- Finally, the before and after DEMs are uploaded to ArcGIS Pro, where the minus tool is used to subtract the two surfaces and produce a new layer, which shows areas of erosion and deposition as a result of the dam-break event. A red-blue symbology colour ramp usually works best to visualise the topographic changes in the table landscape (see example results in file linked below).
Dambreak_results_example.docx (Microsoft Word 2007 (.docx) 7.9MB Nov17 26)
The film below and at right shows examples of the dam-break simulations produced by the students:
Dambreak.mp4 (MP4 Video 138.8MB Nov25 26)
The following file contains an example of a handout with instructions as used for the SfM and GIS aspects of the project:
GEOG2310_2324_Wk22_PracticalHandout.pdf (Acrobat (PDF) 840kB Nov17 26)
Teaching Notes and Tips
The original version of this project used Agisoft Metashape SfM software and ArcGIS Pro GIS software for the data analysis aspect. Other software is available to undertake each of the stages. This includes open source/freeware options. QGIS is very suitable to replace ArcGIS Pro for this type of analysis. There are similar alternatives , but it is essential that the software can also convert the model into a DEM.
Note that not all student photo datasets will necessarily produce a sufficiently clear model. For this reason, it is useful to create a few image datasets from dam-break test runs and make sure at least one of these produces suitable before and after models, which can then serve as a back-up dataset, for the modeling part of the project, in case student data collection fails.
Assessment
This project was not assessed. It was part of a 30 credit Geography research methods module, where students learn to design and execute a group research project. Besides the techniques needed for this research project, they also learn some additional techniques which they can use for their independent dissertation research project in the final year.
References and Resources
James, L.A., Hodgson, M.E., Ghoshal, S. and Latiolais, M.M., 2012. Geomorphic change detection using historic maps and DEM differencing: The temporal dimension of geospatial analysis. Geomorphology, 137(1), pp.181-198.
Javernick, L., Brasington, J. and Caruso, B., 2014. Modeling the topography of shallow braided rivers using Structure-from-Motion photogrammetry. Geomorphology, 213, pp.166-182.
Woodget, A.S., Carbonneau, P.E., Visser, F. and Maddock, I.P., 2015. Quantifying submerged fluvial topography using hyperspatial resolution UAS imagery and structure from motion photogrammetry. Earth surface processes and landforms, 40(1), pp.47-64.