Changes in river morphology
Summary
This laboratory activity uses a stream table to examine how morphological interventions change sediment transport dynamics and the longitudinal equilibrium profile of rivers. The interventions are channel straightening, dyking, constriction of the cross-section, widening, weir removal and in-channel aggregate extraction. Starting from an initial equilibrium state with controlled slope and discharge, students make hypotheses about how erosion and deposition will be distributed in space, based on theoretical principles of hydraulics and sediment transport. Lidar surveys taken before and after each run are then used to quantify the resulting morphological changes and test their hypotheses.
Learning Goals
Content/Concept Goals:
The goal of this lab is to study the impacts of changes in river morphology (river course correction, dyking, widening, removal of weir) and quantify these changes with lidar surveys (before/after). Using a stream table provides a concrete way to illustrate certain abstract or complex concepts covered during the theoretical lectures.
Higher order thinking skills goals:
- Predict the changes (erosion/deposition) and try to quantify it in space
- Master the lidar data processing
Other skills goals
- Working in group (collaboration)
- Write a lab report
Context for Use
Type and level of course:
The activity is taking place during a Bachelor level course entitled "River hydraulics and management" for engineers.
Students must have mastered before beginning:
- Basics concepts in hydraulics
- Sediment transport mechanisms
How situated in a course:
The lab activity is part of a sequence of practical work on hydraulic benches.
Description and Teaching Materials
The student can choose one topic in the list below:
- Impact of river course correction on sediment transport and equilibrium line
- Impact of dyking on sediment transport
- Impact of a narrowing in the cross-section caused by a bridge or culvert
- Impact of river widening on sediment transport
- Impact of weir removal on river profile
- Impact of a dredging pit (gravel/sand extraction) in a river
For each topic, we provide a detailed lab protocol to the students describing:
- the studied process
- the initial state of the system (equilibrium)
- the physical parameters (slope, discharge, duration)
Before turning on the pump, the students should:
- Predict the evolution of the river
- Justify their choices based on their theoretical knowledge (hydraulics, sediment transport)
- Do a lidar survey in order to get the initial state of the river system
The students can then turn on the pump and run the experiment. They should observe the different processes and take notes as well as pictures and videos for the lab report.
At the end of the experiment, they perform a second lidar survey. Based on their observations and data, the students should finally confirm or infirm their initial hypothesis and try to explain the differences. They write a short report of max. 10 pages describing their hypothesis, the experimental setup and their results.
Teaching Notes and Tips
Some experiments require a stable initial state. It is therefore necessary to plan ahead so that the table is ready when the lab work begins.
The lab activity should last around 2 hours in total.
Assessment
The lab report is graded and their work methodology during the lab will be evaluated.