Flood Recovery - Stream Restoration and Infrastructure Repair

Staci Pomeroy, VT Agency of Natural Resources

Author Profile
Initial Publication Date: November 19, 2026
DOI | Cite this

Summary

The Flood Recovery activity is to provide students with an opportunity to develop skill for addressing flood response, and day-to-day activities, for infrastructure repair work. The activity is set up with a flood disaster scene, in which students need to repair the roads and crossing structure, while still maintaining and creating important river and habitat features in the river channel. This provides hands-on learning to understand how our work in and along the river for flood recovery needs to be done with river process in mind in order to ensure the repair project is successful and maintains a healthy river system.

Share your modifications and improvements to this activity through the Community Contribution Tool »

Learning Goals

Content/Concept Goals:
Goal of the activity is to help students see how different types of infrastructure can work in the river, try their hand at building that infrastructure, keying in on the challenges for working in the river (ie: getting your rip-rap keyed in correctly, getting the culvert at the right depth and slope), and creating and maintaining important river process (ie: meanders, channel roughness, sediment transport considerations), and habitat.
Higher order thinking skills goals:
This activity challenges students to think about what techniques are needed to work in and along the river system to help maintain a flood resilient infrastructure. Students learn about the type of river data (ie: slope, depth, width, planform, bed features) they would need to collect in order to install their infrastructure to be flood resilient, while maintaining river process and habitat features; and about the different types of principles and practices for determining the when/where/why different types of infrastructure are installed in and along the river.
Other skills goals
This activity is a group activity. Our groups have been 10-12 people around the table. The group needs to decide what type of structure they will use to repair the destroyed culvert, what stabilization techniques they will use to repair the roads, and how they will create and maintain river and habitat features that were affected by the flood and initial flood response work. The group then works together to install those repairs and river & habitat features.

Context for Use

Type and level of course:
This activity is used as part of the VT River & Roads training series. The students range in profession from contractors, consultants, engineers, state and municipal road crew, state, federal, town emergency response staff, Conservation districts, and others who may be assisting in flood recovery and/or work along the rivers.
Students must have mastered before beginning:
This activity requires a basic understanding of the river process (ie: general type of features you'd expect in a river - bedform, vegetation/wood, habitat) and basic understanding of infrastructure concepts (culvert/bridge sizing needs, what rip-rap is, installation techniques. The skills do not have to be mastered, but have a conceptual understanding of what/where/why we look for river and habitat features to be maintained when working in the river and what are some of the key aspects of infrastructure installation that are important to keep in mind when doing that work - ie: don't narrow the channel with rip-rap (it speeds up the velocity), don't dig too deep (it triggers a head cut), make the bridge/culvert the right width (bankfull or larger), maintain roughness in the channel... etc.
How situated in a course:

This is a two-day class, and is a mix of classroom presentations, stream table activity, and field site visits. On day one students learn the basics of river process and habitat features, visit streams to see and learn more about the river and habitat and then come back to "build a natural river". The Flood Recovery activity is on day two. Day two is focused on basics of infrastructure that is in and along our rivers (culverts/bridges, roads, bank stabilization ,etc.) and the VT installation standards for those practices that will help those projects be as flood resistant as possible and maintain river process and habitat features in the river.

The stream table activity is approximately 30-40 minutes. The students are asked to do the work "in the dry" for 15 minutes - creating their repairs and stream features w/o the water running. Once the team feels they have their repairs and river & habitat features in place, the water is turned on, and students see how their efforts are working. The students spend another 15-20 minutes with their stream table with the water running, seeing what worked, what didn't work as they anticipated, where they need to do repair, could change something; and then if needed/desired by the team make those changes while the water is running to see what happens. They can change the flow to go from low to flood stage to continue to see how their work holds up under different conditions and how the river and habitat features responds as the flows are changed.

Description and Teaching Materials

Students get the following props: 1 gallon bucket of mixed size rock (3/4"-3" - this is mixed of stream gravels and small angled rock I got at the hardware store), bag of mixed size sticks (to simulate mixed size tree/wood for the stream); bag of fish tank green vegetation (to simulate riparian vegetation), mixed structures (box culvert, round culvert, squash culvert, bridge deck), big & small "concrete" waste blocks, several gabion baskets, small squares and triangles of tile (to simulate concrete wingwalls or flood walls.

The set up props are: roads (made out of cut up black door mat) and mix of toys that make it fun - ie: houses, trucks, excavators, etc.

To create the flood recovery scene, the material in the stream table is pushed around to create a valley within the table (so there are steeper side slopes and a lower area for the stream channel to set up), the top of the slide slope is flattened and the road set up along both sides of the river. Along the river, create sections where the road is impacted by the river, ie: create a section of road that the bank has failed under the road; at the head of the stream table, create and area for a stream crossing that has failed (ie: an undersized culvert - I usually put a clump of sticks in front of the failed culvert like a debris jam got caught in the culvert and it failed), and then towards the lower end of the stream table create an island in the middle of the channel (ie: the river had a flood chute happen during the flood). I had a mix of wood and vegetation in and along the channel, along with random rocks; to simulate the river has gone through a flood and now there is a mix of wood, veg and rocks in the channel that may be part of maintain/create the river process.


Example 1 of flood recovery table (PowerPoint 2007 (.pptx) 241kB Oct28 26)
Example 2 of flood recovery table (PowerPoint 2007 (.pptx) 243kB Oct28 26) 

Teaching Notes and Tips

I made these props from what I could find around the house - mix size metal cans make great culverts (you can hammer one side flat to make a squash culvert), mixed size pvc pipe also make good culverts, a square juice jug cut apart makes a good box culvert, I had some left over tile from a project that makes good "concrete" walls, I made the concrete waste-blocks with left over tile mortar - made a small form for two sizes of blocks; the gabion baskets are from hardware cloth I folded into a box and filled with small rock and sewed with wire. The bridge deck is pieces of 1/2 wood that are 6-8" long x 3-4" wide. We have one 3-D printed bridge. So if someone has a 3-d printer you could make lots of props.




Flood Recovery - Stream Restoration and Infrastructure Repair -- Discussion  

Do the students ever create the flood themselves to see how and where it affects the preexisting channel? They could then design the repairs and test them.

35189:48036

edittextuser=1961 post_id=48036 initial_post_id=0 thread_id=35189

Hi Lisa, in our training we do not have time to have students set up their own flood for a preexisting channel, but they do get to test different flows in the channels they develop for the repair work. Your idea would be a good exercise for students to work through creating a channel and infrastructure set up and then have a flood to where and what types of damages happen and consider options for repairs and install them to see how they function.

35189:48038

edittextuser=488016 post_id=48038 initial_post_id=0 thread_id=35189

Join the Discussion


Log in to reply