Attachment F, Aquifer Test Report, Wildwood Property Wells G & H Superfund Site Woburn, MA
RETEC 1996 U.S. EPA Vol. I, Technical Report, April 1996

Attachment to previous report. Deals with a small aquifer test on the Wildwood (Riley 15-acres) property performed as a test for design of a pilot pump and treat system.



Resource Type: Data, References
Topics: Woburn:Wells G and H Superfund Site, Woburn, Hydrogeology, Pollution SourcesKeywords: Wildwood property, Riley 15 acres, pilot pump and treat study