figure_15._costs_waiting.png


View Original Image at Full Size

Figure 15. The costs of waiting to remove and replace dams once approved using the Olmstead Dam and Locks system on the Ohio River. Lambrecht, Bill (16 September 2013). "Costly Dam, Illinois dam costing billions more than expected as delays mount". St. Louis Post-Dispatch. Retrieved 9 March 2014.