three_phases_streambank_stabilizati_14732652921161141465.png


View Original Image at Full Size

Figure 7.12: Phases of streambank stabilization (A) excavation of undesirable material, (B) new topsoil added, and (C) the final product with stream banks overgrown with lush vegetation.
Originally uploaded in Integrate:Teaching for Sustainability:InTeGrate Modules:Coastal Processes, Hazards and Society:Student Materials.

Image 131337 is a 607 by 975 pixel WebP
Uploaded: Sep7 16


Last Modified: 2016-09-07 11:21:33
Permanent URL: https://serc.carleton.edu/download/images/131337/three_phases_streambank_stabilizati_14732652921161141465.webp

The file is referred to in 1 page
Provenance
Credit: Caulk, A.D., J.E. Gannon, J.R. Shaw, and J.H. Hartig. 2000. Best Management Practices for Soft Engineering of Shorelines. Greater Detroit American Heritage River Initiative, Detroit, Michigan.
Reuse
No information about limits on reusing this item have been recorded. You will need to contact the original creator for permission in cases that exceed fair use (see http://fairuse.stanford.edu/).