Figure 7.12: Phases of streambank stabilization (A) excavation of undesirable material, (B) new topsoil added, and (C) the final product with stream banks overgrown with lush vegetation.
Originally uploaded in Integrate:Teaching for Sustainability:InTeGrate Modules:Coastal Processes, Hazards and Society:Student Materials.
Image 131337 is a 607 by 975 pixel WebP
Uploaded:
Sep7 16