View Original Image at Full SizeFigure 3: Longitudinal profiles of the water surface elevation from 2 km upstream to 2 km downstream of the dam site showing changes in the channel profile through time. The long profile from 1911 is reconstructed from a pre-construction plan. Notice the upstream progression of the erosion and the deposition immediately below the dam.
Image 18294 is a 1024 by 2020 pixel WebP
Uploaded:
Dec3 09
Last Modified: 2009-12-29 12:15:07
Permanent URL: https://serc.carleton.edu/download/images/18294/longitudinal_profile.webp
The file is referred to in 1 page
Provenance
Created by the author of the page containing
this file.
ReuseThis item is offered under a Creative Commons Attribution-NonCommercial-ShareAlike license
http://creativecommons.org/licenses/by-nc-sa/3.0/ You may reuse this item for non-commercial purposes as long as you provide attribution and offer any derivative works under a similar license.