image of Flow front of the released water for the


View Original Image at Full Size

Figure 5. Flow front of the released water for the "Pulse-Flow" event initiated on March 23, 2014 as the result of release of about 105,000 acre-ft of water from Morelos Dam by an Agreement (Minute 319) between the U.S. and Mexico in 2012.
Originally uploaded in Integrate:Teaching for Sustainability:InTeGrate Modules:Water Science and Society:Student Materials.

Image 151016 is a 469 by 834 pixel WebP
Uploaded: Mar28 17


Last Modified: 2017-03-28 09:21:01
Permanent URL: https://serc.carleton.edu/download/images/151016/image_flow_front_released.webp

The file is referred to in 1 page
Provenance
Photo: courtesy of US Geological Survey
Reuse
No information about limits on reusing this item have been recorded. You will need to contact the original creator for permission in cases that exceed fair use (see http://fairuse.stanford.edu/).