UniFirst Corp., RD/RA year 1 annual report: groundwater monitoring and capture system performance for the UniFirst site remedial action of the northeast quadrant of the Wells G&H Site, Woburn, Massachusetts
ENSR Consulting and Engineering 1993 U.S. EPA Region I

First annual report concerning effectiveness and performance of the pump-and-treat remediation system installed at UniFirst.



Resource Type: References
Topics: Woburn:Wells G and H Superfund Site, Woburn, Pollution Sources, HydrogeologyKeywords: UniFirst, PCE, TCE, remediation, recovery, capture